Modern Farmhouse Kitchen Remodel
Kitchen

Modern Farmhouse Kitchen Remodel

Complete kitchen transformation with custom white shaker cabinets, quartz countertops, and subway tile backsplash in Winter Garden, FL.

Location

Winter Garden, FL

Completed

March 2024

Investment

$52,000

Size

280 sq ft

Project Specifications

Detailed specifications, materials, and features used in this kitchen project.

Cabinetry
Style:White Shaker
Material:Solid Wood Doors, Plywood Boxes
Hardware:Brushed Nickel Pulls and Knobs
Features:Soft-Close Hinges and Drawers
Countertops
Material:Quartz
Color:Calacatta Laza
Edge:Eased Edge
Thickness:3cm
Backsplash
Material:Ceramic Subway Tile
Size:3" x 6"
Color:White
Grout:Charcoal Gray
Appliances
Range:36" Gas Range - KitchenAid
Refrigerator:Counter-Depth French Door - KitchenAid
Dishwasher:Stainless Steel - KitchenAid
Microwave:Over-Range - KitchenAid
Flooring
Material:Luxury Vinyl Plank
Brand:Shaw Floors
Color:Weathered Oak
Finish:Matte
Key Features
Custom white shaker cabinets
Quartz countertops with waterfall edge
Subway tile backsplash
Stainless steel appliance package
Pendant lighting over island
Under-cabinet LED lighting
Soft-close cabinet hardware
Large kitchen island with seating
Project Team

Project Manager

David Rodriguez

Lead Craftsman

Mike Thompson

Designer

Lisa Chen

Project Details

Duration

6 weeks

Investment

$52,000

Square Footage

280 sq ft

Completed

March 2024

Challenges & Solutions

Existing electrical panel required upgrade for new appliances

Upgraded electrical panel to 200-amp service

Structural beam limited island size options

Designed custom island to work within structural constraints

Coordinating appliance delivery with installation timeline

Established clear delivery schedule with appliance vendors

Project Timeline

Follow the step-by-step process of this kitchen project from start to completion.

Planning & Design

Initial consultation, measurements, and design finalization

1 week
Site measurement and assessment
Design consultation and 3D rendering
Material selection and ordering
Permit applications

Demolition

Removal of existing kitchen elements

3 days
Remove old cabinets and countertops
Disconnect and remove appliances
Prepare walls and flooring
Protect adjacent areas

Rough-In Work

Electrical, plumbing, and structural modifications

1 week
Update electrical wiring and outlets
Relocate plumbing for island
Install new lighting circuits
Drywall repairs and painting prep

Installation

Cabinet, countertop, and finish installation

3 weeks
Install new flooring
Install and level cabinets
Template and install countertops
Install backsplash tile

Finishing

Final details and quality inspection

1 week
Install and connect appliances
Install lighting fixtures
Hardware installation and adjustments
Final cleanup and walkthrough

Client Testimonial

Hear directly from the homeowner about their experience with this kitchen project.

"Karhan Construction transformed our outdated kitchen into a stunning, functional space that has become the heart of our home. The attention to detail and quality of craftsmanship exceeded our expectations. We couldn't be happier with the results!"
S

Sarah & Mike Johnson

Kitchen Project - Winter Garden, FL