Luxury Master Bathroom Renovation
Bathroom

Luxury Master Bathroom Renovation

Spa-inspired master bathroom with walk-in shower, freestanding tub, and heated marble floors in Orlando, FL.

Location

Orlando, FL

Completed

February 2024

Investment

$42,000

Size

180 sq ft

Project Specifications

Detailed specifications, materials, and features used in this bathroom project.

Fixtures
Tub:Freestanding Acrylic Soaking Tub
Shower:Frameless Glass Enclosure
Toilet:Wall-Mounted Elongated
Sinks:Vessel Sinks (2)
Vanity
Style:Floating Double Vanity
Material:White Oak with Matte Finish
Countertop:Quartz - Calacatta Gold
Storage:Soft-Close Drawers
Tile & Stone
Floor Tile:24"x24" Porcelain - Marble Look
Wall Tile:12"x24" Porcelain - Marble Look
Shower Tile:Large Format Porcelain
Accent:Natural Stone Mosaic
Plumbing
Shower System:Rainfall Head + Body Sprays
Tub Filler:Floor-Mounted Faucet
Vanity Faucets:Single Handle Vessel Faucets
Finish:Brushed Gold
Key Features
Heated marble-look porcelain floors
Frameless glass shower enclosure
Rainfall shower with body sprays
Freestanding soaking tub
Double vanity with vessel sinks
LED mirror lighting
Brushed gold fixtures throughout
Natural stone accent tile
Project Team

Project Manager

Jennifer Davis

Lead Craftsman

Carlos Rodriguez

Project Details

Duration

4 weeks

Investment

$42,000

Square Footage

180 sq ft

Completed

February 2024

Challenges & Solutions

Limited ceiling height for proper ventilation

Installed low-profile exhaust fan with remote motor

Existing plumbing location conflicted with new design

Rerouted plumbing through adjacent closet space

Coordinating heated floor installation with tile work

Used electric radiant heating system under tile

Project Timeline

Follow the step-by-step process of this bathroom project from start to completion.

Planning & Permits

Design finalization and permit acquisition

1 week
Final design approval
Permit applications
Material ordering
Contractor scheduling

Demolition

Removal of existing bathroom fixtures and finishes

2 days
Remove existing fixtures
Demo tile and flooring
Expose plumbing and electrical
Prepare for rough-in work

Rough-In

Plumbing, electrical, and structural work

1 week
Relocate plumbing for new layout
Install heated floor system
Update electrical for new lighting
Waterproofing installation

Tile Installation

Floor and wall tile installation

1.5 weeks
Install floor tile with heating system
Install wall tile and accent pieces
Grout and seal all tile work
Install shower glass enclosure

Fixture Installation

Installation of all fixtures and final details

3 days
Install vanity and countertop
Install and connect all fixtures
Install lighting and mirrors
Final cleanup and inspection

Client Testimonial

Hear directly from the homeowner about their experience with this bathroom project.

"Our master bathroom renovation was handled with such professionalism and care. The team listened to our vision and brought it to life perfectly. The spa-like atmosphere they created has made our daily routine so much more enjoyable."
M

Michael & Jennifer Martinez

Bathroom Project - Orlando, FL